Elliott Group successfully delivered all Civil, Structural, and Architectural (CSA) works for the construction of a major energy centre located on the western section of the site. The facility is designed as a captive power generation plant with a nominal base load capacity of 200 MW.
The scope included the installation of 10 gas turbines, supported by 8 transformer bays (33/20 kV) to the southeast and 10 transformers serving the turbines to the west. Additional infrastructure comprised four 200 m³ fuel storage tanks, dedicated fuel oil and fire pump enclosures, sprinkler and water tanks, and a water treatment plant.
Supporting systems featured six black-start generators, a power trunk building, a medium/low voltage building, and two grid transformers. To the southwest, a Gas AGI compound was constructed, incorporating a control room, plant kiosk, and boiler house. External works included landscaping, drainage, parking, lighting, and road layouts, completing a comprehensive energy infrastructure package.
-
Scale
200MW -
Client
Echelon Data Centres -
Architect
Kavanagh Tuite & ARC MC
Project Gallery
Get in touch
At Elliott Group, we are proud of our exceptional team of professionals who are available to talk to you in person or who can answer any question you might have.