
- Client
RCSI - Location
Beaumont Hospital - Value
€20,000,000
Beaumont Hospital has developed a new dedicated three-storey, 20-bed in-patient Cystic Fibrosis Unit which will form part of the National Clinical Care Programme for Cystic Fibrosis (NCPCF), providing specialised care tailored to the needs of cystic fibrosis patients.
The Scott Tallon Walker led design team proposal is based on providing single occupancy high dependency PPVL bedroom accommodation.
These rooms will be equipped and supported by state-of-the-art treatment facilities that will integrate with the Main Hospital to ensure seamless access to comprehensive medical care. The floor area consists of 553.05m2 on the lower ground floor, 729.32m2 on the upper ground floor, 728.85m2 on the first floor, and 993m2 of refurbishment in the existing healthcare facility to which this new CFU connects, giving an overall total area of 3004m2.
“This project holds deep meaning for so many individuals and families. The impact of this unit cannot be overstated—it will be a lifeline for those in need of specialist care. We are honoured to be entrusted with bringing this vision to life and look forward to delivering a completed facility in October. A special thanks to Beaumont Hospital for their continued trust in us, and to the entire project team for their dedication and collaboration in reaching this milestone together.’’
Darragh Elliott. CEO Elliott Group ROI
Scheduled for completion before the end of 2025, the new unit will provide single inpatient isolation rooms with en-suite facilities, ensuring the highest levels of infection control and patient care.
-
Architect
Scott Tallon Walker -
Services Engineer
Homan O'Brien
Project Gallery
Get in touch
At Elliott Group, we are proud of our exceptional team of professionals who are available to talk to you in person or who can answer any question you might have.