  • Client
    Belcamp
  • Location
    Belcamp, Dublin 17
  • Value
    €11,175,000

Our Project

The Belcamp 220kV Substation development comprises the construction of a new highvoltage transmission facility designed to strengthen and futureproof Dublin’s electricity network. Located adjacent to the existing operational Belcamp Substation, the project includes the delivery of a new GIS building, reinforced concrete substructures, structural steel frame, precast concrete wall and roof systems, specialist electrical installations, internal fit-out works, and comprehensive testing and commissioning.

The project also incorporates extensive external works, including underground cable duct networks, cable chambers, storm and foul drainage infrastructure, hardstanding areas, perimeter security works, precast boundary walls, and palisade fencing. Delivered within a live electrical environment, the works require strict compliance with ESB safety and proximity requirements, detailed BIM-led planning, and careful coordination around existing high-voltage assets to ensure safe and efficient project delivery.

Key Features

• New 220kV GIS substation building
• Structural steel and precast concrete construction
• Extensive cable duct and utility infrastructure
• Storm and foul drainage networks
• Hardstanding and perimeter security works
• Live operational ESB substation environment
• Strict electrical safety and proximity controls
• Testing, commissioning and handover

  • Start Date
    March 2026
  • End Date
    March 2027
  • Duration
    55 weeks
  • Architect
    ESB

Project Gallery

Get in touch

At Elliott Group, we are proud of our exceptional team of professionals who are available to talk to you in person or who can answer any question you might have.

  • Start Date
    March 2026
  • End Date
    March 2027
  • Duration
    55 weeks
  • Architect
    ESB