Elliott Group is proud to have successfully completed the new Cystic Fibrosis In-Patient Unit at Beaumont Hospital, delivered on programme and with the highest standards of care, quality and collaboration.
This project represents far more than construction. Working alongside the incredible teams at Beaumont Hospital, Cystic Fibrosis Hope Foundation and Cystic Fibrosis Ireland, our shared goal was to create a world class facility that gives comfort, dignity and recovery for every patient.
The 20 bed in-patient unit was delivered within a live hospital environment, with a seamless integration to the existing hospital, and maintaining the highest standards of infection control, health and safety. Every aspect of the build was delivered with exceptional care and attention to detail.
To everyone involved, the Beaumont and CF teams, our design partners Scott Tallon Walker Architects, O’Reilly Hyland Tierney & Associates, Black & White Engineering, Catalyst, Jensen Hughes and PUNCH Consulting Engineers, and especially our own Elliott Group project team, thank you for bringing this project to life. We are truly honoured to have been part of this story and to have met not only those behind the vision, but also the surgeons and nurses who will continue to provide exceptional care for people living with Cystic Fibrosis in Ireland.
Watch the full story;