{"id":624,"date":"2021-12-17T09:48:06","date_gmt":"2021-12-17T09:48:06","guid":{"rendered":"http:\/\/elliot-group-dev.flywheelsites.com\/?post_type=projects&#038;p=624"},"modified":"2022-04-19T16:55:58","modified_gmt":"2022-04-19T16:55:58","slug":"momentum-support","status":[17],"type":"projects","link":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/","title":{"rendered":"Momentum Support"},"content":{"rendered":"<p>The building consists of 1,200m<sup>2<\/sup> double height warehouse and 800m<sup>2<\/sup> Grade A offices and staff facilities. The project was carried out over two Phases with a 6 month break between phases. Works consisted of alterations and extension of an existing steel frame. Recladding of the roof and entire envelope, including installation of new curtain walling and glazed revolving entrance door. Internally a grade office fitout was undertaken on the ground and 1st floor. The 1st floor was sup-ported by a structural metsec frame and fire slabbed on the underside. Once these works were completed the fitout of the M&amp;E services and lift could commence.<\/p>\n<p>All services were exposed on the project and careful planning and coordination was implemented on the project to ensure that the quality of installations were of an extremely high standard. Once walls were 1st fixed with service we created a hold point on the project and all stake holder had to sign off before the voids could be closed. The same process was implemented for the ceiling and fire proofing. Benchmarks were agreed prior to finishing works commencing. Once the void closures were completed all of the walls and ceilings were closed and skimming commenced. The feature stairs was also hoisted into position at this stage in the project and protection laid down. Fitout included Glazed screens, FF&amp;E, Kitchens, Showers and changing facilities, reception desk, feature wall panelling, floor finishes etc.<\/p>\n<p>The external works on the project commenced once the envelope was completed and these included the installation of a large attenuation tank, new services to the building including service connections on the Naas Rd. Once all services were connected to the building we commence commissioning. The O&amp;M file was completed prior to completion and a Pre-notification was carried out on the project in Terms of BCAR which meant the Client could get into the building immediately after we had completed with no need for a post validation period.<\/p>\n","protected":false},"featured_media":867,"template":"","location":[28],"sector":[30],"class_list":["post-624","projects","type-projects","status-publish","has-post-thumbnail","hentry","status-completed","location-roi","sector-commercial"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Momentum Support - Elliott Group UK<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Momentum Support - Elliott Group UK\" \/>\n<meta property=\"og:description\" content=\"The building consists of 1,200m2 double height warehouse and 800m2 Grade A offices and staff facilities. The project was carried out over two Phases with a 6 month break between phases. Works consisted of alterations and extension of an existing steel frame. Recladding of the roof and entire envelope, including installation of new curtain walling [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/\" \/>\n<meta property=\"og:site_name\" content=\"Elliott Group UK\" \/>\n<meta property=\"article:modified_time\" content=\"2022-04-19T16:55:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.elliottgroup.com\/uk\/wp-content\/uploads\/sites\/2\/2021\/12\/Momentum-Support-image_five.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/\",\"url\":\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/\",\"name\":\"Momentum Support - Elliott Group UK\",\"isPartOf\":{\"@id\":\"https:\/\/www.elliottgroup.com\/uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.elliottgroup.com\/uk\/wp-content\/uploads\/sites\/2\/2021\/12\/Momentum-Support-image_five.jpg\",\"datePublished\":\"2021-12-17T09:48:06+00:00\",\"dateModified\":\"2022-04-19T16:55:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#primaryimage\",\"url\":\"https:\/\/www.elliottgroup.com\/uk\/wp-content\/uploads\/sites\/2\/2021\/12\/Momentum-Support-image_five.jpg\",\"contentUrl\":\"https:\/\/www.elliottgroup.com\/uk\/wp-content\/uploads\/sites\/2\/2021\/12\/Momentum-Support-image_five.jpg\",\"width\":1170,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.elliottgroup.com\/uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Momentum Support\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.elliottgroup.com\/uk\/#website\",\"url\":\"https:\/\/www.elliottgroup.com\/uk\/\",\"name\":\"Elliott Group UK\",\"description\":\"A tradition in construction\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.elliottgroup.com\/uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Momentum Support - Elliott Group UK","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/","og_locale":"en_US","og_type":"article","og_title":"Momentum Support - Elliott Group UK","og_description":"The building consists of 1,200m2 double height warehouse and 800m2 Grade A offices and staff facilities. The project was carried out over two Phases with a 6 month break between phases. Works consisted of alterations and extension of an existing steel frame. Recladding of the roof and entire envelope, including installation of new curtain walling [&hellip;]","og_url":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/","og_site_name":"Elliott Group UK","article_modified_time":"2022-04-19T16:55:58+00:00","og_image":[{"width":1170,"height":800,"url":"https:\/\/www.elliottgroup.com\/uk\/wp-content\/uploads\/sites\/2\/2021\/12\/Momentum-Support-image_five.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/","url":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/","name":"Momentum Support - Elliott Group UK","isPartOf":{"@id":"https:\/\/www.elliottgroup.com\/uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#primaryimage"},"image":{"@id":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#primaryimage"},"thumbnailUrl":"https:\/\/www.elliottgroup.com\/uk\/wp-content\/uploads\/sites\/2\/2021\/12\/Momentum-Support-image_five.jpg","datePublished":"2021-12-17T09:48:06+00:00","dateModified":"2022-04-19T16:55:58+00:00","breadcrumb":{"@id":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#primaryimage","url":"https:\/\/www.elliottgroup.com\/uk\/wp-content\/uploads\/sites\/2\/2021\/12\/Momentum-Support-image_five.jpg","contentUrl":"https:\/\/www.elliottgroup.com\/uk\/wp-content\/uploads\/sites\/2\/2021\/12\/Momentum-Support-image_five.jpg","width":1170,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/www.elliottgroup.com\/uk\/projects\/momentum-support\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.elliottgroup.com\/uk\/"},{"@type":"ListItem","position":2,"name":"Momentum Support"}]},{"@type":"WebSite","@id":"https:\/\/www.elliottgroup.com\/uk\/#website","url":"https:\/\/www.elliottgroup.com\/uk\/","name":"Elliott Group UK","description":"A tradition in construction","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.elliottgroup.com\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.elliottgroup.com\/uk\/wp-json\/wp\/v2\/projects\/624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elliottgroup.com\/uk\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.elliottgroup.com\/uk\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elliottgroup.com\/uk\/wp-json\/wp\/v2\/media\/867"}],"wp:attachment":[{"href":"https:\/\/www.elliottgroup.com\/uk\/wp-json\/wp\/v2\/media?parent=624"}],"wp:term":[{"taxonomy":"status","embeddable":true,"href":"https:\/\/www.elliottgroup.com\/uk\/wp-json\/wp\/v2\/status?post=624"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/www.elliottgroup.com\/uk\/wp-json\/wp\/v2\/location?post=624"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/www.elliottgroup.com\/uk\/wp-json\/wp\/v2\/sector?post=624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}